How a 2008-bond geothermal school was built, why the bore field stopped working, and what the ORG renovation scope replaces. Drag to orbit. Scroll or pinch to zoom.
Model is a 16-ft slice through a one-story school with the front wall removed. Well depth is compressed for the frame; real bores run several times deeper than the building is tall. Ground warming is a picture of the mechanism, not a measured loop temperature. Sources: Dallas ISD CSP CS 207156 (Oran Roberts ES, May 2023), CSP 207808 (Gilliam Collegiate Academy, 2025), CSP 207809 (Wilmer-Hutchins ES, 2025), TDLR TABS filings, and reporting on the Wilmer-Hutchins HS failure of June 2023.
NTXP LLC · General Contractors · Woman-Owned · HUB Certified